Design and Analysis supported the industries supply chain to provide structural validation for saloon interior partition panels, toilet wall panels, electrical cubicle cabinets, drivers foot pedal, bike and bulk storage units, luggage stacks and wheelchair supports. Please contact us…
Read moreLondon Underground
Design and Analysis were contracted to undertake structural analysis support for the Bombardier designed trains for the latest London Underground rolling stock. This involved a deep tube train design for the Victoria line (2009 Tube Stock) and replacement trains…
Read more
Design and Analysis were contracted to undertake structural analysis support for the Bombardier designed trains for the latest London Underground rolling stock. This involved a deep tube train design for the Victoria line (2009 Tube Stock) and replacement trains…
Read morePassenger Seats
Design and Analysis were brought on-board to help a Finland based seat manufacture to develop a GM/RT2100 issue 5 compliant seat for the UK rail industry. We used our internally developed 95th percentile male test dummy to ensure the…
Read more
Design and Analysis were brought on-board to help a Finland based seat manufacture to develop a GM/RT2100 issue 5 compliant seat for the UK rail industry. We used our internally developed 95th percentile male test dummy to ensure the…
Read moreCrossrail Trains
Design and Analysis were contracted by Bombardier transportation to help with the development of their new Crossrail trains to run on the new Elizabeth Line running East West though the heart of central London. We carried out all the…
Read more
Design and Analysis were contracted by Bombardier transportation to help with the development of their new Crossrail trains to run on the new Elizabeth Line running East West though the heart of central London. We carried out all the…
Read more